Project

Requirements management for “New Dock A and base”

Zurich Airport,
Germany

Project description

At Zurich Airport, Dock A and its dock base are being replaced as part of a major infrastructure renewal. Various ancillary and interim measures are required to enable the implementation of the new infrastructure.

During the preliminary planning and preliminary project phases, LOGO InfraConsult supports requirements planning and requirements management for several subprojects.

The scope of work includes the database-based capture and evaluation of existing requirement documents as well as the documentation and consolidation of new planning requirements. These requirements form the basis for quality assurance throughout the subsequent planning and design phases.

In addition, LOGO InfraConsult develops operator concepts, prepares process descriptions, and defines utilization and equipment concepts.


Customer

Airport Zurich AG


Services

  • Requirements management
  • Functional developer support
  • Coordination of the process steps within requirements management
  • Database-based recording and updating of requirements
  • Development of operator concepts
  • Process consulting and process descriptions 
  • Consolidation of planning requirements as standard fact sheets 
  • Quality assurance in the form of planning reviews and target-actual comparisons
  • Creation of utilization and fitting concepts 

Project data

  • Program consisting of a variety of individual projects
  • Main “new dock A and base” project in sustainable wooden construction
  • Multifunctional dock for Schengen and non-Schengen passengers
  • Realization planned from 2030
  • Approx. 60.000 m² gross total area
  • Project start: since April 2023