Project

New Concept for Security Checks

Frankfurt Airport,
Construction of Terminal 3,
Germany

Project description

The airport operator has decided to adopt a similar version of the security check configuration in the new construction of Terminal 3, which was developed by the Ministry of the Interior and is currently being tested at the Cologne Bonn Airport. LOGO handled the coordination between the responsible airport operations and the project department. In line with the construction project, it was possible to functionally align the optimum processes for passenger (§ 5 LuftSiG, Federal Aviation Security Act) and personnel (§ 8) screening and prior planning requirements, and visualize these processes in drawings. 

Customer

Fraport Ausbau Süd GmbH as a subsidiary of Fraport AG,
Department: Requirements Management 

Services

  • Development of binding plans and objectives (requirements management)
  • Function-oriented concept study
  • Preparation of planning documents
  • Monitoring of targets (design review)
  • Coordination of operational issues
  • Coordination of technical equipment for passenger and personnel handling and airport security
  • Stakeholder management

Project data

  • Project period: 2016/2017
  • Annual capacity of up to 25 million passengers
  • 75 gates
  • New infrastructure connection
  • Total investment volume: approx. EUR 2.5 billion
  • Commissioning target date: 2023